Your Flooring Roadmap

A complete guide from
consultation to care

Follow our proven 12-step process — every detail covered so your floor is flawless, start to finish.

Phase 1 · Steps 1–5

Planning, Selection & Prep

Map your rooms, choose the right flooring, and get the site ready.

1

Identify Areas

Decide which rooms need flooring — living, bedrooms, kitchen. Note moisture-prone areas and high-traffic zones.

2

Choose Type & Pattern

Pick based on usage: engineered/laminate for living & bedrooms, SPC/vinyl for kitchens & baths, decking for outdoors. Patterns: Straight, Herringbone, Chevron, Diagonal, Parquet.

3

Select Specs

Lock in shade, thickness (8/10/12mm), skirting, profiles, and underlayment type.

4

Expert Review

We review your selections and give you a confirmed specification sheet — no surprises later.

5

Site Preparation

Complete all painting, electrical, plumbing & woodwork. Ensure floor is level, clean, and dry — the #1 factor for a flawless install.

Phase 2 · Steps 6–10

Samples, Measurement & Order

We bring samples to you, measure precisely, and lock in your order.

🛈 Already renovating? Skip to Step 6 if your site is ready.

6

Site Sample Review

See & feel physical samples under your room's lighting. Compare 2–3 shortlisted options against your walls and furniture.

7

Finalise Colour & Thickness

Walk through every room with the chosen sample. Confirm the exact colour code, thickness, and finish.

8

Site Measurement

We visit for precise room-by-room measurement. Door clearances and subfloor condition checked for an accurate quote.

9

Confirm Order & Pay

Detailed quote with materials, installation, accessories, and taxes. No hidden costs — everything is itemised.

10

Material Prep & Site Check

We order, QC, and schedule. You confirm the site is cleared, clean, and dry — ready for installation.

Phase 3 · Steps 11–12

Installation & Beyond

Our team lays your floor, and we set you up for years of enjoyment.

11

Installation Day

Our in-house team installs your floor: underlayment, planks in your chosen pattern, skirting & profiles. Expansion gaps maintained. Final clean-up included. Floor ready to use immediately — 2–5 days.

12

Post-Installation Care

Walkthrough inspection, care guide, warranty activation (10–25 yr product + 1 yr service), and lifetime support. Use felt pads, sweep regularly, clean spills promptly.

At a Glance

The complete timeline

Week 1–2

Planning & Selection

Steps 1–4: Rooms mapped, type & specs chosen, expert-approved.

Week 2

Pre-Interior Work

Step 5: Painting, ceiling & woodwork done. Site leveled and cleaned.

Week 2–4

Samples, Measure & Order

Steps 6–9: Samples reviewed, colour locked, site measured, order placed.

Week 4

Prep & Material Ready

Step 10: Materials QC'd and scheduled. Site confirmed ready.

Week 4–5

Install & Enjoy

Steps 11–12: Floor laid in 2–5 days. Walkthrough, warranty, lifetime support.